Brief: Discover the high-performance Rack And Pinion Heavy Payload Construction Site Elevator SC250BG KP-B19, designed for efficiency and durability. This construction hoist features modular design, high-strength materials, and advanced VFD technology for smooth operation. Ideal for heavy payloads up to 2,500 KG and lifting heights up to 450 meters.
Related Product Features:
Modular design with standardized and universal components for easy assembly and maintenance.
Constructed from 16Mn and Q355B high-strength cold roll steel plate for durability.
Laser-cut and CNC-processed parts ensure precision and reliability.
Robot-welded cage roof prevents water leakage and enhances strength.
Variable Frequency Drive (VFD) ensures smooth starting/stopping and reduces wear.
Payload capacity of 2,500 KG per cage with a lifting speed of 0-80 m/min.
Maximum lifting height of 250/450 meters, adaptable with step-up/step-down transformer.
Complies with European Regulation EN 12159:2012 and EN 60204-1:2006/A1:2009.
Vraagstukken:
Wat is de laadcapaciteit van de SC250BG KP-B19 bouwkraan?
De SC250BG KP-B19 heeft een laadvermogen van 2.500 kg per kooi, waardoor het ideaal is voor zware bouwwerkzaamheden.
What materials are used in the construction of this elevator?
The main structure is made of 16Mn and Q355B high-strength cold roll steel plate, laser-cut and CNC-processed for precision, with robot-welded components for durability.
Does this elevator comply with international safety standards?
Yes, the SC250BG KP-B19 is TUV proved and complies with European Regulation EN 12159:2012 and EN 60204-1:2006/A1:2009, ensuring high safety standards.
What is the maximum lifting height of this construction hoist?
The maximum lifting height is 250 meters standard, extendable to 450 meters with a step-up/step-down transformer upon request.